![]() |
Wisconsin Administrative Code (Last Updated: January 10, 2017) |
![]() |
Agency SPS. Department of Safety and Professional Services |
![]() |
Chapters 301-. Safety, Buildings, and Environment |
![]() |
Chapters SPS326-360. General, Part II |
![]() |
Chapter SPS345. Mechanical Refrigeration |
![]() |
SubChapter VI. Changes, Additions or Omissions to ANSI/IIAR 2 |
Section 345.611. Overpressure protection.
Latest version.
- (1) Discharge capacity of plate heat exchangers. This is a department alternative to the requirements in ANSI/IIAR 2 section 11.2.7: The minimum required relief device capacity for a plate heat exchanger based on an external heat addition scenario may be calculated in accordance with the following equation:where:C r,plate HX = minimum required relief device capacity for the
plate heat exchanger (lb m /min of air)f = relief device capacity factorL = length of the plate pack (ft)W = width of the plate pack (ft)H = height of the plate pack (ft)(2) Discharge piping for atmospheric pressure relief. This is a department rule in addition to the requirements in ANSI/IIAR 2 section 11.3.6.1: Appendix A Tables A-3 may not be used for schedule 80 piping.