Wisconsin Administrative Code (Last Updated: January 10, 2017) |
Agency SPS. Department of Safety and Professional Services |
Chapters 301-. Safety, Buildings, and Environment |
Chapters SPS326-360. General, Part II |
Chapter SPS341. Boilers And Pressure Vessels |
SubChapter IV. New Installations |
Section 341.47. Multi-boiler installations.
Latest version.
- When hot-water heating boilers are installed in multiples with a common header and a common return, isolation valves may be eliminated between units and the units may be considered as one boiler provided all of the following conditions are met:(1) Output limit. No single unit exceeds 500,000 Btu per hour output.(2) Pressure relief. Each unit has a pressure relief device as required by the ASME code, or the common header has a pressure relief device with sufficient relieving capacity for all units in the installation.(3) Controls. Each unit has operating controls and safety controls acceptable to the department.(4) Low-water cutoff. The fuel supply to each unit is shut off by a low-water cutoff in the event of low water in the system.
Cr.
Register, February, 1988, No. 386
, eff. 3-1-88;
CR 11-047
: am. (intro.), (1) to (3)
Register May 2012 No. 677
, eff. 6-1-12.