Section 340.32. Revisions, alterations and piping upgrades.  


Latest version.
  • (1) Plan revisions.
    (a) The changes specified in par. (b) to approved plans for gas systems, that are made before commencement of system operation, shall be submitted for review and approval as a revision. Revised plans submitted to the department for review shall include the department plan number for the original plans.
    (b) Plans shall be submitted to the department or a first class city for review and approval of any changes in tank location or capacity, piping arrangement or material, safety setback clearance, point of transfer location, design of indoor fueling operation, and gas detection or monitoring equipment location.
    (2) Alterations and piping upgrades.
    (a) Alterations to gas systems after commencement of system operation shall comply with the requirements for plan approval in s. SPS 340.30 , the certificate of installation in s. SPS 340.31 and the inspection in s. SPS 340.34 .
    (b) Piping upgrades shall be inspected by the department or the first class city prior to the start of fabrication.
CR 11-002 : cr. Register August 2011 No. 668 , eff. 9-1-11; correction in (2) (a) made under s. 13.92 (4) (b) 7. , Stats., Register December 2011 No. 672 .