Section 185.751. Alternate sample-testing plan for "before-use" test for 5/8-, 3/4-, and 1-inch meters.  


Latest version.
  • (1)  All rebuilt meters must be tested before use.
    (2)  Meters as received from the supplier without a certificate of accuracy shall be divided into lots of 36 or less. Each lot shall consist of meters of the same make, type, and size.
    (3)  A random-selected sample of 4 meters from each lot shall be selected and tested.
    (4)  If any of the tested meters in a given lot fail to meet the accuracy requirements of s. PSC 185.65 (2) for new meters, either the entire lot shall be rejected, or the utility shall test all meters in the lot, rejecting or correcting those found to be inaccurate.
    (5)  Records shall be maintained showing the identification numbers of all meters in each lot and the test results for the meters tested per s. PSC 185.19 .