Section 185.46. Metering equipment records.
Latest version.
- (1) Meter test records.(a) A utility shall create a record of a meter test whenever a meter is tested. If the meter is tested again, the utility need not retain the previous test record once the information in that record has been entered in the meter history record. The meter test record shall include all of the following:1. Identification of the meter.2. The service address at which the meter is installed.3. The date of the test.4. A statement of "as found" accuracies.5. A statement of "as left" accuracies, when applicable.6. The name of the person making the test.(b) Meter test records and meter history records may be kept as separate records or one record.(2) Meter history records.(a) Each utility shall keep a history record for each meter sufficient to fulfill the requirements of s. PSC 185.19 , including all of the following:1. The date the meter was placed into service.2. The information in all of the meter's test records under sub. (1) .3. The date the meter was retired from service.(b) Meter test records and meter history records may be kept as separate records or one record.
Cr.
Register, January, 1997, No. 493
, eff. 2-1-97;
CR 13-033
: r. and recr. (1), (2)
Register July 2015 No. 715
, eff. 8-1-15.