![]() |
Wisconsin Administrative Code (Last Updated: January 10, 2017) |
![]() |
Agency NR. Department of Natural Resources |
![]() |
Chapters 600-699. Environmental Protection – Hazardous Waste Management |
![]() |
Chapter 665. Interim License Hazardous Waste Treatment, Storage And Disposal Facility Standards |
![]() |
SubChapter L. Waste Piles |
Section 665.0254. Design and operating requirements.
Latest version.
- The owner or operator of each new waste pile on which construction commences after June 1, 1995, each lateral expansion of a waste pile unit on which construction commences after June 1, 1995 and each replacement of an existing waste pile unit that is to commence reuse after June 1, 1995 shall install 2 or more liners and a leachate collection and removal system above and between the liners, and operate the leachate collection and removal systems in accordance with s. NR 664.0251 (3) , unless exempted under s. NR 664.0251 (4) , (5) or (6) , and shall comply with the procedures of s. NR 665.0221 (2) . "Construction commences" is as defined in s. NR 660.10 under "existing facility".