Section 465.24. General compliance requirements.  


Latest version.
  • (1) What are my general requirements for complying with this subchapter?.
    (a) You shall be in compliance with the emission limitations in this subchapter according to both of the following requirements:
    1. Any coating operation or operations for which you use the compliant material option or the emission rate without add-on controls option, as specified in s. NR 465.23 (2) (a) and (b) , shall be in compliance with the applicable emission limit in s. NR 465.23 (1) at all times.
    2. Any coating operation or operations for which you use the emission rate with add-on controls option, as specified in s. NR 465.23 (2) (c) , shall be in compliance with the applicable emission limit in s. NR 465.23 (1) and the work practice standards in s. NR 465.23 (4) at all times. Each controlled coating operation shall be in compliance with the operating limits for emission capture systems and add-on control devices required by s. NR 465.23 (3) at all times, except for solvent recovery systems for which you conduct liquid-liquid material balances according to s. NR 465.28 (2) (g) .
    (b) You shall always operate and maintain your affected source, including all air pollution control and monitoring equipment you use for purposes of complying with this subchapter, according to the provisions in s. NR 460.05 (4) (a) 1.
    (c) If your affected source uses an emission capture system and add-on control device, you shall maintain a log detailing the operation and maintenance of the emission capture system, add-on control device, and continuous parameter monitors during the period between the compliance date specified for your affected source in s. NR 465.21 (4) and the date when the initial emission capture system and add-on control device performance tests have been completed as specified in s. NR 465.28 (1) . This requirement does not apply to a solvent recovery system for which you conduct a liquid-liquid material balance according to s. NR 465.28 (2) (g) in lieu of conducting performance tests.
    (d) If your affected source uses an emission capture system and add-on control device, you shall develop and implement a written startup, shutdown and malfunction plan according to the provisions in s. NR 460.05 (4) (c) . The plan shall address the startup, shutdown and corrective actions in the event of a malfunction of the emission capture system or the add-on control device. The plan shall also address any coating operation equipment that may cause increased emissions or that would affect capture efficiency if the process equipment malfunctions, such as conveyors that move parts among enclosures.
    (2) What parts of the general provisions apply to me?. General provisions of ch. NR 460 apply to an owner or operator of a facility subject to this subchapter as indicated in ch. NR 460 Appendix NNNN .
History: CR 03-037 : cr. Register March 2004 No. 579 , eff. 4-1-04.