Section 449.11. Initial report.  


Latest version.
  • (1)  The owner or operator of any source to which this chapter applies and on which construction or modification is commenced after February 1, 1984 shall notify the department in writing that the equipment and procedural specifications in s. NR 449.07 (2) (a) to (h) are being implemented.
    (2)  The statement shall be submitted to the department within 90 days of the initial startup date. The statement shall contain the information specified in this subsection.
    (a) A list of the equipment installed for compliance,
    (b) A description of the physical and functional characteristics of each piece of equipment,
    (c) A description of the methods which have been incorporated into the standard operating procedures for measuring or calculating the emissions for which emission limits are prescribed in s. NR 449.07 (2) (a) 1. and (f) 1. , and
    (d) A statement that each piece of equipment is installed and that each piece of equipment and each procedure is being used.
History: Renum. from NR 154.19 (6) (k) and am. Register, September, 1986, No. 369 , eff. 10-1-86.