Section 346.06. Bonding.  


Latest version.
  • (1)  A performance or surety bond may be required for noncommercial removal projects regulated by this chapter. The bond amount shall be equal to the estimated cost for restoration of dangerous conditions or undesirable environmental conditions as determined by the department caused by incomplete or improper removal of bed materials from the project site or for removal in excess of volumes authorized. The maximum bond amount shall not exceed the estimated project cost. In determining the need for a bond the department shall consider the potential for creating unsafe conditions, environmental sensitivity of the project site, the qualifications of the applicant or contractor and potential for removal in excess of authority.
    (2)  A performance or surety bond shall be required for commercial removal projects. The amount of the bond shall be determined by the department on the basis of the methods of removal, project site conditions, project size, project duration and the qualifications of the applicant or contractor.
History: Cr. Register, September, 1980, No. 297 , eff. 10-1-80.