Wisconsin Administrative Code (Last Updated: January 10, 2017) |
Agency NR. Department of Natural Resources |
Chapters 300-399. Environmental Protection – Water Regulation |
Chapter 333. Dam Design And Construction |
Section 333.08. Construction.
Latest version.
- (1) Construction of a new dam or reconstruction of an existing dam may not begin until the department approves the plans and specifications submitted under s. NR 333.05 .(2) Alterations to any plans or specifications that were approved by the department under s. NR 333.05 which will affect the flood flow capacity or structural integrity of a dam shall be approved by the department before construction or reconstruction of the dam.(3) All dams shall be constructed or reconstructed under the supervision of a professional engineer registered in the state of Wisconsin. The supervising engineer shall, within 10 days after completing the construction or reconstruction of a dam, submit a statement indicating that the dam was constructed or reconstructed in accordance with the plans and specifications approved by the department under s. NR 333.05 .(4) As-built plans shall be submitted to the department within 30 business days after the completion of construction or reconstruction of a dam.
History:
Cr.
Register, May, 1985, No. 353
, eff. 6-1-85;
CR 00-136
: am. (3),
Register July 2001, No. 547
eff. 8-1-01.