![]() |
Wisconsin Administrative Code (Last Updated: January 10, 2017) |
![]() |
Agency NR. Department of Natural Resources |
![]() |
Chapters 300-399. Environmental Protection – Water Regulation |
![]() |
Chapter 328. Shore Erosion Control Structures In Navigable Waterways |
![]() |
SubChapter I. Shore Erosion Control Structures on Inland Lakes and Impoundments |
Section 328.07. Prohibited erosion control methods.
Latest version.
- (1) Permanent breakwaters . Except as provided in subch. II , construction of permanent breakwaters is prohibited.(2) New seawalls. Except as provided in s. NR 328.06 (4) or s. 30.203 , Stats., construction of new seawalls is prohibited.(3) New riprap . Construction of new riprap is prohibited at low energy sites, except as provided in s. NR 328.06 (3) (b) .
Note
Construction of new riprap may be authorized at moderate and high energy sites as provided in s.
NR 328.05 (5)
or
328.06 (3)
.
Microsoft Windows NT 6.1.7601 Service Pack 1