Section 206.05. Compliance with effluent limitations and monitoring requirements.  


Latest version.
  • (1)  All new or modified land disposal systems approved on or after December 1, 1990 shall comply with the applicable effluent limits and monitoring requirements of this chapter and groundwater quality standards in ch. NR 140 .
    (2)  All land disposal systems, except large scale soil absorption systems, approved or modified prior to December 1, 1990 shall comply with the effluent limits as shown in Table 1, and with the groundwater quality standards in ch. NR 140 .
    (3)  All land disposal systems, except large scale soil absorption systems, approved prior to December 1, 1990 shall comply with the monitoring requirements described in s. NR 206.09 by January 1, 1994.
    (4)  Large scale soil absorption systems shall comply with the effluent monitoring requirements of this chapter and with the groundwater quality standards in ch. NR 140 . Influent monitoring may be required on a case-by-case basis.
    (5)  All systems, except large scale soil absorption systems, approved prior to December 1, 1990 shall comply with the effluent limits for BOD 5 and load/rest requirements described in ss. NR 206.08 (1) (b) 1. , (2) (b) 3. , (3) (b) 3. , and 110.25 (4) (f) .
    (6)  All systems for which groundwater monitoring is required under s. NR 206.10 shall comply with the groundwater monitoring construction requirements of s. NR 110.25 and ch. NR 141 . - See PDF for table PDF
History: Cr. Register, March, 1985, No. 351 , eff. 4-1-85; r. and recr. Register, November, 1990, No. 419 , eff. 12-1-90.