Section 290.12. Posting of prevailing wage rates.  


Latest version.
  • (1)  A clearly legible copy of the prevailing wage rate determination issued by the department or exempted local governmental unit, together with the provisions of s. 66.0903 (10) (a) and (11) (a) , 66.0904 (8) (a) and (9) (a) , or 103.49 (2) and (6m) , Stats., shall be kept posted in at least one conspicuous and easily accessible place on the site of each project by the contracting state agency, owner or developer of real property, or local governmental unit and the notice shall remain posted during the full time any laborer, worker, mechanic or truck driver is employed on the project.
    (2)  If there is no appropriate site on a project, a local governmental unit may post the prevailing wage rate determination at the place normally used to post public notices.
    (3)  Before the date that work is first performed by a minor subcontractor, a contractor or subcontractor that hires a minor subcontractor shall provide a copy of the prevailing wage determination for the project to the minor subcontractor.
History: Cr. Register, January, 1976, No. 241 , eff. 2-1-76; am. Register, January, 1986, No. 361 , eff. 2-1-86; am. (1) (intro.), Register, June, 1987, No. 378 , eff. 7-1-87; renum. to be (1), cr. (2), Register, September, 1997, No. 501 , eff. 10-1-97; am. (1), renum. (2) to be (3), cr. (2), Register, July, 2000, No. 535 , eff. 8-1-00; correction in (1) made under s. 13.93 (2m) (b) 7., Stats., Register, July, 2000, No. 535 ; CR 10-092 : am. (1), (3) Register December 2010 No. 660 , eff. 1-1-11.

Note

Section 66.0904, Stats., was repealed by 2011 Wis. Act 32 . Microsoft Windows NT 6.1.7601 Service Pack 1