Chapter 152. Model Ordinances For Construction Site Erosion Control And Post-Construction Storm Water Management  


Section 152.01. Purpose.
Appendix A Model Construction Site Erosion Control Zoning Ordinance
Construction Storm Water Management Zoning Ordinance

Note

Adoption by a city, county, village or town of either model ordinance in its entirety is voluntary. However, there are other administrative rules, such as chs. NR 120 , 153 and 216 , which require consistency of local regulations with the performance standards of ch. NR 151 . These performance standards are incorporated in the model ordinances. Requests for printed or electronic copies of the model ordinances may be submitted to the Wisconsin Department of Natural Resources, Runoff Management Section, Box 7921, Madison, WI 53707-7921. Microsoft Windows NT 6.1.7601 Service Pack 1