Section 93.1605. Fees relating to storage tanks for liquids that are flammable, combustible or federally regulated hazardous substances.  


Latest version.
  • (1) Plan examination and inspection fees. Fees for the examination of plans, site inspections and reinspections for tanks used for the storage of liquids that are flammable, combustible or federally regulated hazardous substances shall be determined in accordance with Table 93.1605.
    (2) Groundwater fee. Pursuant to s. 168.23 (5) , Stats., in addition to any fee charged by the department by rule for plan review and approval for the construction of a new or additional installation or change in operation of a previously approved installation for the storage, handling or use of flammable, combustible or hazardous liquids, the department shall collect a groundwater fee of $100 for each plan review submittal. The moneys collected under this subsection shall be credited to the environmental fund for environmental management.
    (3) Reinspection fee. The contractor, when performing activities covered under ss. SPS 305.84 to 305.87 , shall pay the reinspection fee to the authorized agent if the authorized agent is required to make a return trip due to any of the following, or is required to reschedule a trip on less than 24 hours notice of any of the following:
    (a) Failure to have the tank system accessible for inspection on the date and time specified for inspection.
    (b) Installation inspection points that are incomplete on the date and time specified for inspection.
    (c) Failure to correct deficiencies by the date and time specified for inspection.
    (4) Special inspection fee. The owner or operator shall pay the miscellaneous inspection fee specified in s. SPS 302.04 (2) to the authorized agent for any of the following reasons:
    (a) Replacement of identical equipment where the department or local program operator has waived the plan submittal requirement.
    (b) Pre-operational inspection required by the department as a result of compliance orders where plan submittal is not required. - See PDF for table PDF
Cr. Register, June, 1992, No. 438 , eff. 7-1-92; am. Table, Register, March, 1996, No. 483 , eff. 4-1-96; correction in Table 2.43 made under s. 13.93 (2m) (b) 7., Stats., Register, November, 1999, No. 527 ; am. Table 2.43, Register, July, 2000, No. 535 , eff. 9-1-00; CR 05-038 : r. and recr. Register October 2005 No. 598 , eff. 11-1-05; CR 07-029 : am. Table 2.43 Register November 2008 No. 635 , eff. 2-1-09; CR 09-017 : am. (title) and (1) Register July 2009 No. 643 , eff. 8-1-09; correction in (1), (3) (intro.), (4) (intro.) made under s. 13.92 (4) (b) 7., Stats., Register December 2011 No. 672 ; SPS 302.43 renum. ATCP 93.1605 under s. 13.92 (4) (b) 1., Stats.; (title) revised under s. 13.92 (4) (b) 2., Stats.; corrections in (1), (2) made under s. 13.92 (4) (b) 7., Stats., Register October 2013 No. 694 .

Note

In accordance with s. 168.23 (5) (b) , Stats., an installation that has a capacity of less than 1,000 gallons is not subject to the groundwater fee. Microsoft Windows NT 6.1.7601 Service Pack 1 Section SPS 305.84 covers aboveground tank system installation certification requirements. SPS 305.85 covers underground tank system installation certification requirements. SPS 305.86 covers tank system lining certification requirements. SPS 305.87 covers tank system removing and cleaning certification requirements. Microsoft Windows NT 6.1.7601 Service Pack 1