Section 54.05. Reports.  


Latest version.
  • (1) Monthly report. Within 10 days after the end of each calendar month, the permittee shall submit a report to the department consisting of:
    (a) A copy of the summary record prepared under s. ATCP 54.04 (2) .
    (b) A copy of the roster prepared under s. ATCP 54.04 (4) , listing the names and addresses of all employees and other persons participating or assisting in the conduct of operations.
    (c) A copy of the federal interim activity report filed for the month with the national oceanic and atmospheric administration under the federal weather modification reporting act. ( 15 USC 330 )
    (d) A narrative account of the manner in which operations during the month did not conform to the operational plan filed under s. ATCP 54.03 .
    (2) Final report. Within 30 days after completion of any operation, the permittee shall file with the department a final report on the operation consisting of:
    (a) Copies of logs prepared under s. ATCP 54.04 (1) , weather records obtained under s. ATCP 54.04 (3) , and totals for the entire operational period based on monthly summary records prepared under s. ATCP 54.04 (2) .
    (b) A copy of the federal final activity report filed with the national oceanic and atmospheric administration under the federal weather modification reporting act. ( 15 USC 330 )
    (c) A narrative account of the manner in which the operation did not conform to the operational plan filed under s. 93.35 (6) (b) 5. , Stats., and s. ATCP 54.03 (2) .
    (3) Evaluation report. Within 120 days after completion of the operation the permittee shall file with the department a narrative evaluation of the operation. The data for this report shall be assembled and evaluated on basis of the evaluation plan prepared under s. ATCP 54.03 (3) (d) .
    (4) Sponsor's report. Permittees shall file with the department a copy of all reports made by the permittee to sponsors of the operation within 10 days after such report was submitted to the sponsor.
History: Cr. Register, September, 1979, No. 285 , eff. 10-1-79.