Section 155.33. Grade statement.


Latest version.
  • Within 7 days after a load of sweet corn is harvested, the contractor shall provide the producer with a grade statement for that load as required by s. ATCP 155.03 (5) . A contractor shall orally provide grade information on request of the producer made prior to delivery of the written grade statement. The grade statement shall state the percentage by weight of sweet corn in each grade category, the damaged portion of ears, as determined by the grader under this subchapter, and the information required under s. ATCP 155.03 (5) . If the maturity classification of sweet corn is determined under s. ATCP 155.32 (2) , the grade statement shall also include the maturity classification as determined by the grader.
History: Cr. Register, December, 1990, No. 420 , eff. 1-1-91.