Section 383.60. Purpose.  


Latest version.
  • (1)  Specific types of methods and technologies may be recognized by the department under the voluntary product approval process in s. SPS 384.10 (3) as conforming with subchs. IV and V and may be utilized in the design of POWTS for a specific project.
    (2)  This subchapter does not limit the use of other methods and technologies for POWTS or POWTS components the performance of which has been recognized under the plan review and approval process of s. SPS 383.22 or the voluntary product approval process of s. SPS 384.10 (3) or both.
Cr. Register, April, 2000, No. 532 , eff. 7-1-00; CR 07-100 : am. (1) Register September 2008 No. 633 , eff. 10-1-08; correction in (1), (2) made under s. 13.92 (4) (b) 7. , Stats., Register December 2011 No. 672 .

Note

Subsection SPS 384.10 (3) delineates a process for the voluntary submittal of specific methods and technologies that are proposed to be utilized as POWTS holding, treatment or dispersal components and for the department's evaluation of such submittals. Methods and technologies recognized under this process may be utilized in any POWTS within the specifications and parameters of the method or technology. Methods and technologies recognized under this process do not require the submittal of data at the time of plan review and approval process under s. SPS 383.22 to substantiate the performance of the specific method or technology. Microsoft Windows NT 6.1.7601 Service Pack 1 Information regarding recognized methods and technologies may be downloaded at: http://dsps.wi.gov/SB/SB-PubsPlumbProdReg.html . Microsoft Windows NT 6.1.7601 Service Pack 1 Section SPS 383.22 delineates the process for the submittal of a plan for a POWTS design to be utilized for a specific project at a specific site. Under this section methods and technologies for POWTS holding, treatment or dispersal components that have not been recognized under s. SPS 384.10 (3) , require the submittal to the department of data or information to substantiate performance claims. The approval of a POWTS plan by the department under this section covers only a specific project at a specific site, and does not constitute the recognition of a method or technology for other projects or sites. Microsoft Windows NT 6.1.7601 Service Pack 1