Section 326.45. Requested test.  


Latest version.
  • (1)  Except as provided in sub. (2) , each manufactured home community operator or manufactured home community contractor shall promptly make an accuracy test of any metering installation upon request of a manufactured home community occupant.
    (2)  If less than one year has elapsed since the last meter test, the manufactured home community operator or manufactured home community contractor is not obligated to test the meter unless there is evidence that the meter is damaged or otherwise registering incorrectly.
    (3)  When a meter test is performed upon request of the manufactured home community occupant, an amount equal to 50% of the estimated cost of the meter test shall be advanced to the manufactured home community operator or manufactured home community contractor by the manufactured home community occupant. This amount shall be refunded if the test shows the meter to be over registering by more than 2%. The entire cost resulting from the meter test shall be the responsibility of the manufactured home community occupant if the results of the test show the meter to be under registering or accurate under s. PSC 185.65 (2) .
    (4)  A report giving the results of the test shall be provided to the manufactured home community occupant and a complete original test record shall be kept on file by the manufactured home community operator or manufactured home community contractor for one year following the test date.
    (5)  Upon request, the test shall be made in the presence of the manufactured home community occupant during normal business hours.