Section 302.64. Plumbing systems.  


Latest version.
  • (1) General. Plan examination fees for preliminary or complete plans shall accompany the plans and specifications when submitted. If the department determines, upon review of the plans, that inadequate fees were provided, the necessary additional fees shall be provided prior to departmental approval.
    (2) Examination fees. The plan examination fee shall be determined in accordance with Table 302.64-1. The minimum fee shall be $85.00 per plan. - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
    * For table entries 5. to 11., no additional fee would be required if submitted with the respective drain and vent system.
    ** This fee is in addition to building stormwater and clearwater plumbing systems.
    (3) Examination fees for additions and remodeling. When new or relocated fixtures or both are connected to the existing piping inside a building, the fee shall be determined in accordance with the following procedures:
    (a) Sanitary building sewer, drain and vent.
    1. Total all of the drainage fixture units which are being added or relocated.
    2. Refer to s. SPS 382.30 Table 382.30-2, and determine the horizontal drain size which would be required if all new or relocated fixtures discharged through one pipe.
    3. Determine the fee based on pipe diameter in Table 302.64-1, line 1.
    (b) Building water distribution system.
    1. Total all of the water supply fixture units which are being added or relocated, using s. SPS 382.40 Tables 382.40-1 and 2, and convert to gallons per minute (GPM) in accordance with s. SPS 382.40 Table 382.40-3.
    2. The fees shall be determined in accordance with GPM demand of the new or relocated fixtures as specified in Table 302.64-2. - See PDF for table PDF
    (c) Building storm sewer and drainage system.
    1. Total each different type of area which the new or relocated drains serve and convert to GPM using ch. SPS 382 Tables 382.36-1, 2 and 3. To this, add the GPM discharge from any added or relocated clear water drains located inside the building.
    2. Refer to ch. SPS 382 Table 382.36-4, using the column for 1/4 inch per foot pitch, to determine the horizontal drain size which would be required if all new or relocated fixtures discharged through one pipe. Use this pipe size for determining the fee.
    3. Determine the fee based on pipe diameter in Table 302.64-1, line 18. a.
Cr. Register, June, 1992, No. 438 , eff. 7-1-92; am. Table 2.64-1, Register, February, 1994, No. 458 , eff. 3-1-94; am. Table 2.64-1; Register, February, 1997, No. 494 , eff. 3-1-97; am. (3) (a) 3. and (c) 3. and Tables 2.64-1 and 2.64-2, Register, July, 2000, No. 535 , eff. 9-1-00; CR 02-002 : am. Table 2.64-1 Register April 2003 No. 568 , eff. 5-1-03; CR 04-035 : am Table 2.64-1 Register November 2004 No. 587 , eff. 12-1-04; CR 08-039 : am. (2), (3) (a) 3., (c) 3. and Tables 2.64-1 and 2.64-2 Register November 2008 No. 635 , eff. 12-1-08; CR 09-050 : am. Table 2.64-1 Register December 2009 No. 648 , eff. 1-1-10; correction in (3) (a) 2., 3., (b) 1., 2., (c) 1., 2., 3., Table 302.64-1 made under s. 13.92 (4) (b) 7. , Stats., Register December 2011 No. 672 .

Note

Disregard the asterisk limitation regarding water closets. This pipe size is used for determining the fee only and does not necessarily mean this pipe size is used in actual design or installation. Microsoft Windows NT 6.1.7601 Service Pack 1