Section 2.09. Plans.  


Latest version.
  • (1)  All railroads operating in Wisconsin shall submit to the office for its approval detailed circuit plans and a description of the operations and functions to be performed by signals for any proposed highway-railroad grade crossing signal installation and for proposed changes in existing installations.
    (2)  The railroads shall keep a copy of the circuit plans in the instrument cases for the signal installations.
History: Cr. Register, October, 1982, No. 322 , eff. 11-1-82; am. (1), Register, August, 1986, No. 368 , eff. 9-1-86.