Section 852.07. Water conservation plans.  


Latest version.
  • (1)  A person who is required to submit a water conservation plan under s. NR 852.04 (1) shall submit a plan in a form provided by the department and shall provide all of the information requested on the form and accompanying instructions.
    (2)  A water conservation plan required by this chapter shall, at a minimum, contain all of the following:
    (a) A description and quantification of current water use and reuse as identified by a water use audit, including a calculation of water use intensity appropriate to the water use sector. Those public water systems regulated by the public service commission shall follow applicable procedures to account for water use as provided in ch. PSC 185 and the calculations shall be included in the water use audit.
    (b) A description of the water conservation and water use efficiency goals, including quantifiable goals.
    (c) Documentation of the implementation of the CEMs set forth in s. NR 852.04 (2) and a description of any other existing conservation, efficiency, and reuse measures, including when they were implemented.
    (d) A monitoring plan to assess the impact of the implemented CEMs.
    (3)  Persons identified in Tier 2 shall submit all of the following information in the water conservation plan, in addition to the information required under sub. (2) :
    (a) An implementation timeline for implementing the CEMs or documentation of the implementation of the CEMs in s. NR 852.05 , as appropriate.
    (b) If applicable, the results of an analysis conducted under s. NR 852.09 to determine if a CEM required in Table 2 is cost-effective.
    (c) If applicable, the results of an analysis conducted under s. NR 852.10 to determine if a CEM required in Table 2 is environmentally sound and economically feasible.
    (4)  Persons identified in Tier 3 shall submit all of the following information in the water conservation plan, in addition to the information required under sub. (2) :
    (a) An implementation timeline for implementing the CEMs or documentation of the implementation of the CEMs in s. NR 852.05 , as appropriate.
    (b) If applicable, the results of an analysis conducted under s. NR 852.09 to determine if a CEM required in Table 2 is cost-effective.
    (c) If applicable, the results of an analysis conducted under s. NR 852.10 to determine if a CEM required in Table 2 is environmentally sound and economically feasible.
    (d) The results of the analysis to identify additional CEMs as required by s. NR 852.06 (1) .
    (e) An implementation timeline for implementing the CEMs or documentation of the implementation of the CEMs identified in s. NR 852.06 (1) , as appropriate.
    (f) If applicable, the analysis in s. NR 852.06 (2) .
History: CR 10-060 : cr. Register December 2010 No. 660 , eff. 1-1-11.