Wisconsin Administrative Code (Last Updated: January 10, 2017) |
Agency NR. Department of Natural Resources |
Chapters 700-799. Environmental Protection – Investigation and Remediation of Environmental Contamination |
Chapter 712. Personnel Qualifications For Conducting Environmental Response Actions |
Section 712.07. Requirements for submittal preparation.
Latest version.
- (1) Submittals that are prepared to satisfy the requirements of s. NR 708.11 (4) or 708.13 or chs. NR 716 to 754 , which require the performance of engineering services or scientific evaluations, including phase I and phase II environmental site assessments shall be prepared by or under the supervision of a professional engineer, hydrogeologist, or scientist, except as provided in s. NR 712.11 . All phases of work necessary to obtain data, develop conclusions, recommendations and prepare submittals shall be conducted or supervised by the professional engineer, hydrogeologist, or scientist.(2) Submittals prepared to satisfy the requirements of ch. NR 722 or 724 or s. NR 708.11 (4) , including free product removal conducted in accordance with s. NR 708.13 , for response actions taken to address groundwater contamination shall be jointly prepared by, or under the supervision of, a professional engineer and a hydrogeologist.(3) Submittals prepared to satisfy the requirements of ch. NR 722 or 724 or s. NR 708.11 (4) for response actions that address any media other than groundwater shall be prepared by, or under the supervision of, a professional engineer.(4) Hydrogeologists shall prepare or supervise the preparation of submittals involving the assessment of groundwater conditions at a site or facility, when prepared to satisfy the requirements of ch. NR 716 .
History:
Cr.
Register, April, 1994, No. 460
, eff. 5-1-95; am. (5),
Register, March, 1995, No. 471
, eff. 5-1-95; am. (2) and (3),
Register, April, 1995, No. 472
, eff. 5-1-95;
CR 12-023
: am. (1)
Register October 2013 No. 694
, eff. 11-1-13.
Note
The department recommends that at a minimum, ASTM standards be followed when conducting Phase I and Phase II environmental site assessments. EPA's requirements contained in
40 CFR Part 312
must be followed in order to be eligible for the liability protections contained in CERCLA.
Microsoft Windows NT 6.1.7601 Service Pack 1
This chapter is not intended to authorize the practice of professional engineering in violation of ch.
443
, Stats.
Microsoft Windows NT 6.1.7601 Service Pack 1