Section 708.15. Interim action reports.  


Latest version.
  • (1) General. Responsible parties shall prepare and submit to the department an interim action report, in accordance with this section, describing each interim action taken. The interim action report shall be submitted as part of the remedial action report or the site investigation report, unless otherwise directed by the department or unless sub. (2) is applicable.
    (2) Free product removal. For interim actions conducted to remove free product that was discharged from a UST, responsible parties shall prepare and submit an interim action report to the department within 45 days after confirming a discharge in accordance with the requirements of ch. NR 706 , unless otherwise directed by the department.
    (3) Report contents. The report required in sub. (1) or (2) shall include all of the following:
    (a) Name, address and telephone number of the responsible party.
    (b) Location of the site or facility, or discharge incident, including street address; quarter–quarter section, township, range, and county; the location information specified in s. NR 716.15 (5) (d) ; latitude and longitude, and legal description of lot, if located in platted area.
    (c) The department-issued site or facility identification number.
    (d) The name of the consultant or person who has implemented the measures.
    (e) A description of the interim action implemented.
    (f) The estimated quantity and type of contamination, including the thickness of free product observed or measured in wells, bore holes and excavations when applicable.
    (g) The location and effluent quality of any permitted discharge, such as a wastewater discharge.
    (h) The steps that have been or are being taken to obtain necessary permits for any discharge.
    (i) The type, total volume and final disposition of any recovered hazardous substance discharged and contaminated environmental media generated, treated, stored or disposed of, including legible copies of manifests, receipts and other relevant documents.
    (k) An operation and maintenance plan for any engineering control or barrier employed, including a cover, a groundwater barrier system, or a vapor mitigation system.
History: Cr. Register, April, 1994, No. 460 , eff. 5-1-94; am. (2), Register, February, 1997, No. 494 , eff. 3-1-97; CR 12-023 : am. (1), (2), (3) (b), cr. (3) (k) Register October 2013 No. 694 , eff. 11-1-13; correction in (1) made under s. 13.92 (4) (b) 7. , Stats., Register June 2015 No. 714 .