Section 665.1058. Standards: pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service and flanges and other connectors.  


Latest version.
  • (1)  Monitor pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service and flanges and other connectors within 5 days by the method specified in s. NR 665.1063 (2) if evidence of a potential leak is found by visual, audible, olfactory or any other detection method.
    (2)  If an instrument reading of 10,000 ppm or greater is measured, a leak is detected.
    (3)
    (a) When a leak is detected, repair it as soon as practicable, but not later than 15 calendar days after it is detected, except as provided in s. NR 665.1059 .
    (b) Make the first attempt at repair no later than 5 calendar days after each leak is detected.
    (4)  First attempts at repair include, but are not limited to, the best practices described under s. NR 665.1057 (5) .
    (5)  Any connector that is inaccessible or is ceramic or ceramic-lined (e.g., porcelain, glass or glass-lined) is exempt from sub. (1) and from s. NR 665.1064 .
History: CR 05-032 : cr. Register July 2006 No. 607 , eff. 8-1-06.