Wisconsin Administrative Code (Last Updated: January 10, 2017) |
Agency NR. Department of Natural Resources |
Chapters 600-699. Environmental Protection – Hazardous Waste Management |
Chapter 665. Interim License Hazardous Waste Treatment, Storage And Disposal Facility Standards |
SubChapter J. Tank Systems |
Section 665.0197. Closure and long-term care.
Latest version.
- (1) At closure of a tank system, the owner or operator shall remove or decontaminate all waste residues, contaminated containment system components (liners, etc.), contaminated soils, and structures and equipment contaminated with waste, and manage them as hazardous waste, unless s. NR 661.03 (4) applies. The closure plan, closure activities, cost estimates for closure and financial responsibility for tank systems shall meet all of the requirements specified in subchs. G and H .(2) If the owner or operator demonstrates that not all contaminated soils can be practicably removed or decontaminated as required in sub. (1) , then the owner or operator shall close the tank system and perform long-term care in accordance with the closure and long-term care requirements that apply to landfills ( s. NR 665.0310 ). In addition, for the purposes of closure, long-term care and financial responsibility, such a tank system is then considered to be a landfill, and the owner or operator shall meet all of the requirements for landfills specified in subchs. G and H .(3) If an owner or operator has a tank system which does not have secondary containment that meets the requirements of s. NR 665.0193 (2) to (6) and which is not exempt from the secondary containment requirements in accordance with s. NR 665.0193 (7) , then:(a) The closure plan for the tank system shall include both a plan for complying with sub. (1) and a contingent plan for complying with sub. (2) .(b) A contingent long-term care plan for complying with sub. (2) shall be prepared and submitted as part of the feasibility and plan of operation report.(c) The cost estimates calculated for closure and long-term care shall reflect the costs of complying with the contingent closure plan and the contingent long-term care plan, if these costs are greater than the costs of complying with the closure plan prepared for the expected closure under sub. (1) .(d) Financial assurance shall be based on the cost estimates in par. (c) .