![]() |
Wisconsin Administrative Code (Last Updated: January 10, 2017) |
![]() |
Agency NR. Department of Natural Resources |
![]() |
Chapters 200-299. Environmental Protection – Wisconsin Pollutant Discharge Elimination System |
![]() |
Chapter 254. Iron And Steel Manufacturing |
![]() |
SubChapter I. Cokemaking Subcategory |
Section 254.016. Pretreatment standards for new sources.
Latest version.
- (1) Except as provided in s. NR 211.13 , any existing [new] source subject to this subchapter which introduces pollutants into a POTW shall comply with ch. NR 211 and achieve the PSNS in sub. (2) or (3) .(2) Iron and steel byproduct cokemaking.(b) Increased loadings, not to exceed 24% above the limitations in par. (a) , are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.(c) Increased loadings, not to exceed 58% above the limitations in par. (a) , are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.(3) Merchant byproduct cokemaking.(b) Increased loadings, not to exceed 21% above the limitations in par. (a) , are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.(c) Increased loadings, not to exceed 50% above the limitations in par. (a) , are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
History:
Cr.
Register, May, 1989, No. 401
, eff. 6-1-89.