Section 254.014. New source performance standards.  


Latest version.
  • (1)  The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the NSPS in sub. (2) , (3) , or (4) .
    (2) Iron and steel byproduct cokemaking.
    (a) The following NSPS apply: - See PDF for table PDF
    (1) Within the range of 6.0 to 9.0
    (b) Increased loadings, not to exceed 16% above the limitations in par. (a) , are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
    (c) Increased loadings, not to exceed 39% above the limitations in par. (a) , are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
    (3) Merchant byproduct cokemaking.
    (a) The following NSPS apply: - See PDF for table PDF
    (1) Within the range of 6.0 to 9.0
    (b) Increased loadings, not to exceed 15% above the limitations in par. (a) , are allowed for plants which have wet desulfurization systems but only to the extent that such systems generate an increased effluent volume.
    (c) Increased loadings, not to exceed 35% above the limitations in par. (a) , are allowed for plants which include indirect ammonia recovery systems but only to the extent that such systems generate an increased effluent volume.
    (4) Beehive cokemaking. Beehive cokemaking operations may not discharge process wastewaters to waters of the state.
History: Cr. Register, May, 1989, No. 401 , eff. 6-1-89.