CR_10-069 Amends section NR 29.04 (1) (a) and (b) and creates section NR 29.04 (1) (am), (c) and (d), relating to endangered resources information.  

  • Summary of Final Regulatory Flexibility Analysis
    The Office of the Commissioner of Insurance has determined that this rule will not have a significant economic impact on a substantial number of small businesses and therefore a final regulatory flexibility analysis is not required.
    Summary of Comments by Legislative Review Committees
    The legislative standing committees had no comments on this rule.
    Insurance
    CR 09-096 and 10-038
    Revises section Ins 3.75 , relating to continuation of group insurance policies. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    The Office of the Commissioner of Insurance has determined that this rule will not have a significant economic impact on a substantial number of small businesses and therefore a final regulatory flexibility analysis is not required.
    Summary of Comments by Legislative Review Committees
    The legislative standing committees had no comments on this rule.
    Marriage and Family Therapy, Professional Counseling and Social Work Examining Board
    Revises section MPSW 1.11 , relating to psychometric testing. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    These proposed rules were reviewed by the department's Small Business Review Advisory Committee and it was determined that the rules will not have a significant economic impact on a substantial number of small businesses, as defined in s. 227.114 (1) , Stats.
    Summary of Comments by Legislative Review Committees
    No comments reported.
    Natural Resources
    Fish, Game, etc., Chs. NR 1—
    (DNR # WM-04-08)
    Amends Chapters NR 10 and 45 , relating to hunting in state parks, including department managed portions of State Ice Age Trail areas. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    The revisions to chs. NR 10 and 45 , Wis. Adm. Code, pertain to hunting seasons and regulations. These rules are applicable to individual sportspersons and impose no compliance or reporting requirements for small businesses, nor are any design or operational standards contained in the rule. Therefore, under s. 227.19 (3m) , Stats., a final regulatory flexibility analysis is not required.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Natural Resources
    Fish, Game, etc., Chs. NR 1—
    (DNR # ER-10-10)
    Amends section NR 29.04 (1) (a) and (b) and creates section NR 29.04 (1) (am) , (c) and (d) , relating to endangered resources information. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    Individuals from small businesses (e.g., private consulting firms) may choose to use the services provided in the rule. In the case of a pilot certification program, small businesses with certified employees may benefit from the rule by being able to provide additional services to their clients. These rules impose no compliance or reporting requirements for small businesses and thus are not expected to have a significant economic impact on a substantial number of small businesses. Therefore, under s. 227.19(3m) , Stats., a final regulatory flexibility analysis is not required.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Natural Resources
    Fish, Game, etc., Chs. NR 1 —
    (DNR # LF-05-10)
    Revises Chapter NR 45 , relating to use of departmental property. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    This rule does not impose performance standards or compliance or reporting requirements for small businesses. Small business impacts from the commercial use permit fee increase will be minor as the permit fee increase is $20 per year. Even for a very small-scale business, the cost is likely to be easily absorbed by the business, and offset by revenues generated from the business conducted on the state property. This change is not expected to dramatically increase revenues to the system; rather it updates the fee relative to the value businesses receive from doing business on system properties, and the impact their work may have on the resources or facilities at the property. The current fee is significantly below market value, remains an economical choice for businesses or families to utilize, and is unlikely to impact demand.
    The Corporate Event fee at Lakeshore State Park is $500 for less than 500 attendees and is intended to offset the additional expenses associated with sponsoring the event. The businesses impact is anticipated to be minimal for many small businesses.
    The campground fee increases will not have a negative effect on nearby private campground owners. Private campgrounds may see a small increase in visitation and associated revenue if some campers select the private provider rather than paying the increased fee. The slow-no-wake proposal is not anticipated to have a measurable effect on commercial boat operators.
    This is a Type III action under Chapter 150 , Wis. Adm. Code, and neither are an environmental impact statement nor an environmental assessment is required.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Natural Resources
    Fish, Game, etc., Chs. NR 1 —
    (DNR # FH-17-09)
    Revises Chapters NR 20 , 21 , 22 , and 24 , relating to commercial fishing on the Mississippi river boundary water of Wisconsin. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    Small businesses that may be affected by the proposed rule are commercial fishers who currently hold or may in the future a license for commercial fishing on the Wisconsin waters of the Mississippi River. This rule will allow licensed commercial fishers to use resident or non-resident helpers or crew members and not require the helpers or crew members to each hold an individual license. The rule does require the licensed commercial fisher to notify the department of the name and address of their helpers and crew members before they engage in commercial fishing activities, but only if the helper or crew member does not also hold a current commercial fishing license. This notification may be made when applying for the license, along with the commercial fisher's monthly report, or by calling the department and providing the information.
    No new professional skills are needed to comply with the proposed rule.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Natural Resources
    Fish, Game, etc., Chs. NR 1 —
    (DNR # WM-02-10)
    Revises Chapters NR 8 , 10 , and 12 , relating to license and permit procedures, game and hunting, wildlife damage, and nuisance control and dog trials and training. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    The recommendations have been incorporated into the rule.
    These rules are applicable to individual sportspersons and impose no compliance or reporting requirements for small business, nor are any design or operational standards contained in the rule. Therefore, under s. 227.19 (3m) , Stats., a final regulatory flexibility analysis is not required.
    Summary of Comments by Legislative Review Committees
    The recommendations have been incorporated into the rule.
    Natural Resources
    Fish, Game, etc., Chs. NR 1 —
    (DNR # WM-21-10)
    Revises Chapter 10 , relating to hunting and the 2010 migratory bird seasons and waterfowl hunting zones. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    These rules are applicable to individual sportspersons and impose no compliance or reporting requirements for small business, nor are any design or operational standards contained in the rule. Therefore, under s. 227.19 (3m) , Stats., a final regulatory flexibility analysis is not required.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Natural Resources
    Environmental Protection — General, Chs. NR 100 —
    (DNR # WM-10-02)
    Revises Chapter NR 140 , relating to groundwater standards. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    No specific direct effect on small business is anticipated. This rule establishes health and welfare related groundwater quality standards used for design, compliance and cleanup determinations. No new funding or business activity will be created.
    Summary of Comments by Legislative Review Committees
    The proposed rule revisions were referred to the Senate Committee on the Environment, and the Assembly Natural Resources Committee in August, 2010. No action was taken by either committee.
    Natural Resources
    Environmental Protection — General, Chs. NR 100 —
    (DNR # WT-14-08)
    Revises Chapter NR 151 , 153 , and 155 , relating to runoff pollution performance standards and prohibitions, the targeted runoff management grant program and the urban nonpoint source and storm water management grant programs, and affecting small business. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    Small businesses directly affected by the proposed agricultural revisions in ch. NR 151 are crop and livestock productions. The Wisconsin Agricultural Statistics Service estimates that in 2007 there were about 76,000 farms in Wisconsin (68,000 livestock operations). Most of these operations meet the definition of a small business. Other small businesses that would benefit from these rule revisions are restaurants, shops, marinas and similar businesses that rely on tourism and are adversely affected by degraded lake and river water quality caused by nonpoint source pollution.
    Proposed revisions to the non-agricultural performance standards in ch. NR 151 will apply to any business involved with land-disturbing construction activity. As part of a new construction project, businesses must meet the performance standards both for the construction phase and the post-construction phase as identified in an erosion and sediment control plan and in a storm water management plan. Small businesses established after the effective date of the proposed rule that are required to obtain industrial storm water permits must also meet post-construction performance standards by designing and installing BMPs as part of their industrial storm water pollution prevention plan. Construction erosion control and post-construction storm water management are federal requirements for land disturbing construction sites of one acre or more. This rule proposes prescriptive measures for construction sites of less than one acre or sites not required to obtain permit coverage under the Clean Water Act. These sites are currently meeting similar performance standards as regulated by the Department of Commerce under ch. COMM 60 prior to its transfer to the department. Chapter COMM 60 requires an erosion control plan, but the proposed changes to ch. NR 151 will not require development of a plan, just implementation of appropriate BMPs. There will be no reporting requirement.
    A. Methods for Reducing Impacts on Small Business
    1. Less stringent compliance or reporting requirements.
    Agricultural Operations
    Agricultural livestock and crop producers are required to comply with the new performance standards and modifications to the performance standards contained in ch. NR 151 , just as they are for the existing performance standards and manure management prohibitions. Producers who are in compliance with the existing nutrient management performance standard may already be in compliance with the proposed phosphorus index and tillage setback performance standards. The phosphorus index standard is included in nutrient management technical standard 590. The maintenance of streambank integrity, as proposed through a tillage setback standard, is an assumption of the phosphorus index calculation. In circumstances where the phosphorus index has been determined to be insufficient to achieve water quality standards in areas where a total maximum daily load (TMDL) has been approved, a phosphorus index lower than 6 may ultimately be required. The process wastewater performance standard may require producers to have higher levels of pollution control to be in compliance. The annual cap included in the phosphorus index performance standards may mean that some producers will need to modify their tillage practices to reduce the rate of cropland soil erosion.
    For existing agricultural facilities and practices, compliance is only required if cost sharing is provided at 70% of the eligible costs, or up to 90% for cases of economic hardship. If actions needed to comply with the rules only involve minor management changes that aren't eligible for cost sharing, then a producer must implement those practices to comply with the standards without cost sharing. New agricultural facilities and practices that are established after the effective date of the new and modified performance standards will need to comply, regardless of the availability of cost sharing. In other words, any new facilities or practices installed or constructed after the performance standards are in effect must be installed or implemented in compliance with the new standards.
    The proposed code changes do not require crop producers and livestock operators with less than 1,000 animal units to report to the department. Counties that choose to implement the performance standards and prohibitions via ordinances may require some form of reporting. It is not possible to determine what type of reporting or the impact such reporting would have on these types of operations. In general, the purpose of relying on performance standards and prohibitions is more conducive to minimal reporting, allowing operations to rely on more visual, rather than technical, methods of determining compliance. Reporting required by counties would likely be minimal due to the large number of facilities that will need to meet the standards.
    Non-agricultural Businesses
    The compliance and reporting requirements for businesses involved with land-disturbing construction sites, including commercial sites, will not change except that a plan is no longer required for sites less than one acre. The rule revisions provide for a clarification of the performance standards when developing an erosion and sediment control plan or a storm water management plan, but do not require additional reporting. Small businesses have been meeting the current reporting and compliance requirements of the permit program. It is not anticipated that small businesses undertaking new construction, whether it be for commercial or industrial sites, will have a harder time meeting the reporting and compliance requirements than any other industry or commercial development.
    2. Less stringent schedules or deadlines for compliance or reporting requirements.
    Agricultural Operations
    Existing livestock operations with fewer than 1,000 animal units and crop producers are only required to comply with the new and modified performance standards if cost sharing is provided. Implementation schedules and deadlines, consequently, are dependent on when cost-sharing dollars are available. The code sets up time frames for compliance once dollars are available. Counties, however, may have different time frames established although cost sharing is still required. Since compliance is contingent on cost-share availability and cost-share dollars will be limited each year, it may be years before the standards are fully implemented and less stringent time frames would only stretch compliance out further. New crop producers and livestock facilities with fewer than 1,000 animal units will need to comply with the new and modified performance standards from the date the rule becomes effective, regardless of the availability of cost sharing. It is more cost effective for new facilities to construct best management practices or otherwise comply with performance standards up front rather than correct problems later on.
    Non-agricultural Businesses
    The proposed revisions did not change the schedule for compliance and reporting. A Notice of Intent (NOI) is still required to be submitted 14 days prior to commencing construction. Once construction commences, the required plans must be followed. This rule refines the performance standards for the erosion and sediment control plan and storm water management plan and does not change the time schedule. New industrial permittees will continue to have requirements to submit a Storm Water Pollution Prevention Plan prior to construction of a new site. As part of their construction NOI, their storm water management plan and best management practice implementation will have a clear set of performance standards to meet.
    3. Consolidation or simplification of compliance or reporting requirements.
    Agricultural Operations
    Department compliance and reporting requirements for agricultural operations and facilities are not expected to change as a result of the proposed code changes. For crop producers and livestock operations with fewer than 1,000 animal units, the majority of compliance efforts will be handled through the counties. The counties can provide a convenient, accessible contact for operations and several counties have developed compliance checklists and/or tracking and reporting systems to consolidate and simplify compliance identification and verification. As for reporting, as mentioned above, the proposed rule revisions do not require additional reporting.
    Non-Agricultural Businesses
    For commercial development, the department will be assuming the responsibilities formerly held by the Department of Commerce to regulate storm water discharges from commercial building sites in a manner that meets ch. NR 151 requirements. The rule revisions simplify the construction erosion control requirements that Commerce formerly imposed.
    4. Performance standards in lieu of design or operational standards.
    For both agricultural and non-agricultural operations, the program requirements are already in the form of performance standards. Many of these promote self-assessments on behalf of the operation because they can be easily recognized and complied with via site management or low-cost improvements. However, meeting some of the performance standards may require technical assistance with designs, operational standards or written management plans.
    5. Exemptions from any or all requirements of the rule.
    Agricultural Operations
    Crop producers and livestock operations with fewer than 1,000 animal units cannot be wholly exempted from applicable performance standards and prohibitions because: 1) the authorizing statute was specifically established to apply to these operations (i.e., nonpoint source agricultural operations); and 2) they are the sectors that need to give further consideration to the impacts of their operations on water quality. Conditional exemptions based on the availability of cost sharing do exist.
    Non-agricultural Businesses
    Small businesses that undertake construction are required to comply with the construction erosion control and storm water management requirements of ch. NR 151 . Construction site erosion, whether it is from a small business or a large one is still potentially a major water quality problem and storm water discharges from these sites have been equally regulated with those of other businesses under ch. NR 216 . A small business building and parking lot can have a greater impact than a large business depending on the amount of imperviousness, and its proximity to a water resource. If small business were to be exempt from meeting the performance standards, then the level of control and the attainment of water quality standards would be significantly diminished.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Natural Resources
    Environmental Protection — General, Chs. NR 100 —
    Environmental Protection — Water Supply,
    Chs. NR 800 —
    (DNR # DG-25-10)
    Revises sections NR 142.03 (1) , (2) and (3) and creates Chapter NR 856 , relating to the registration and reporting process for water withdrawals and affecting small business. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    The proposed rule does not have a significant economic impact on small businesses. This rule will affect small businesses that supply their own water with water supply systems that have the capacity to withdraw over 100,000 gallons per day. Small businesses, like other entities that are affected by this rule, will have to determine the amount of water used on a monthly basis and report that water use annually. Small businesses that receive water solely from a public water supply will not be impacted by this rule. The registration, withdrawal measurement, and reporting requirements are straightforward and can be accomplished by most individuals with no specific professional background.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Natural Resources
    Environmental Protection — General, Chs. NR 100 —
    Environmental Protection — Water Supply,
    Chs. NR 800 —
    (DNR # DG-23-10)
    Repeals section NR 142.03 (4) and creates Chapter 850 , relating to water withdrawal fees in the Great Lakes basin and affecting small business. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    Although the rule will primarily affect public water systems, power companies, and large industrial water users, small businesses that will be affected include agricultural operations, including irrigation, livestock, and aquaculture. The department lacks comprehensive data regarding water withdrawals; however, the data the department does have suggests that relatively few small businesses withdraw more than 50 MGY. The proposed modification would limit the fees charged to a small business to $1,000.
    Small businesses that withdraw an average of 100,000 gallons of water per day or more in any 30-day period must report their calendar year water usage to the department by March I of the following calendar year. Minimal computer skills will be necessary to report the amount of water withdrawn annually. Fees based on the amount of water withdrawn must be paid by June 30 th . The department is developing an online reporting mechanism for water withdrawals that is expected to be easy to use and take little time to complete.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Natural Resources
    Environmental Protection — Air Pollution Control,
    Chs. NR 400 —
    (DNR # AM-06-10)
    Revises Chapter NR 410 , relating to asbestos inspection and notification fees. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    The proposed rule changes do not increase any regulatory or reporting requirements on small businesses. Asbestos notification fees that are proposed to be increased by this rule are ultimately paid by the owners of the structures that are being renovated or demolished. Some of those owners are small businesses. However, the increased fee amounts are a very small percentage of the overall cost of the related renovation or demolition projects. No comments were received from building owners concerning the proposed increased fees. Three comments were raised during the public comment period by asbestos abatement contractors, who were likely small businesses. It is quite common for abatement contractors to initially pay the notification fees for a project, and then be reimbursed once they are paid for their work. The issue is the notification fee cost that is "carried" by the contractors during the course of the abatement contract. We believe this can be mitigated by structuring abatement project contracts to provide for payment of notification fees by the project owners as those costs are incurred.
    Summary of Comments by Legislative Review Committees
    The rules were reviewed by the Assembly Committee on Natural Resources and the Senate Committee on Environment. A hearing was held by the Senate Committee on September 29, 2010. No comments or requests for modifications from either committee were forwarded to the Department.
    Natural Resources
    Environmental Protection — Air Pollution Control,
    Chs. NR 400 —
    (DNR # AM-09-10)
    Revises Chapter NR 410 , relating to air management new source permit application review fees. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    The proposed rule has the potential to have a significant impact on a substantial number of small sources.
    I. Identify and discuss why the rule includes or fails to include any of the following methods for reducing the impact on small business.
    A. Less stringent compliance or reporting requirements.
    Not applicable. Proposal does not impose any compliance or reporting requirements
    B. Less stringent schedules or deadlines for compliance or reporting requirements.
    Not applicable. Proposal does not impose any compliance or reporting deadlines.
    C. Consolidation or simplification of performance standards in lieu of design or operational standards.
    Not applicable. Proposal does not impose any performance, design or operational standards.
    D. The establishment of performance standards in lieu of design or operational standards.
    Not applicable. Proposal does not impose any design or operational standards.
    E. The exemption from any or all requirements of the rule:
    Proposal applies to sources that do not qualify for exemptions that currently exist in permitting rule. Proposal does provide relief for small business for additional fees that apply over and above the initial application fee when the small business withdraws the permit application prior to a final determination being made.
    II. Summarize the issues raised by small business during the rule hearings, any changes made in the proposed rule as a result of alternatives suggested by small business and the reasons for rejecting any alternatives suggested by small business.
    No issues were raised by small business during the hearings or during the public comment period.
    III. Identify and describe any reports required by the rule that must be submitted by small business and estimate the cost of their preparation.
    No reports are required by the proposal.
    IV. Identify and describe any measures or investments that small business must take to comply with the rule and provide an estimate of the associated cost.
    No measures or investments need to be made by small business to comply with the proposal.
    V. Identify the additional cost, if any, to the state in administering or enforcing a rule which includes any of the methods listed in I. A through E.
    Not applicable.
    VI. Describe the impact on public health, safety and welfare, if any, caused by including in the rule any of the methods listed in I. A through E.
    Not applicable.
    Summary of Comments by Legislative Review Committees
    The rules were reviewed by the Assembly Committee on Natural Resources and the Senate Committee on Environment. A hearing was held by the Senate Committee on September 29, 2010. No comments or requests for modifications from either committee were forwarded to the Department.
    Natural Resources
    Environmental Protection — Water Supply,
    Chs. NR 800 —
    (DNR # DG-24-10)
    Creates Chapter NR 852 , relating to water conservation and water use efficiency for water withdrawals and affecting small business. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    The proposed rule does not have a significant economic impact on small businesses. This rule will affect small businesses that supply their own water using water supply systems in the Great Lakes basin with certain water withdrawals as identified in Tier 1, Tier 2 or Tier 3 and businesses statewide that withdraw water that will result in a water loss averaging more than 2,000,000 gallons per day in any 30-day period. Small businesses will have to submit an annual report describing and quantifying the success or failure of the implemented CEMs and documentation of any other implemented CEMs as required for Tier 2 or Tier 3 withdrawals. The implementation of water conservation and efficiency measures required for this rule may require basic engineering and accounting skills to analyze the CEMS for cost effectiveness and determine if the CEMs are environmentally sound and economically feasible. Department staff will offer compliance assistance services to help small businesses implement conservation and efficiency measures. Depending on the business sector, there may be a need for businesses to hire external professionals to assist with engineering or accounting skills to implement the CEMs. Small businesses that receive water solely from a public water supply will not be impacted by this rule.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Public Instruction
    Amends section PI 34.31 (2) and creates section PI 34.01 (52m) , relating to school nurse certification. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    The proposed rules will have no significant economic impact on small businesses, as defined in s. 227.114 (1) (a) , Stats.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Regulation and Licensing
    An order of the Department of Regulation and Licensing to repeal RL 7.07 (1) and Appendix I to ch. RL 7 ; to renumber RL 7.03 (6); to renumber and amend RL 7.03 (1) and (3) to (5); to amend ch. RL 7 (title), RL 7.01 (2), 7.02 (1) to (2b) and (7), 7.03 (2), 7.04 (1) (e), (f), (2) and (3), 7.05 (3), 7.07 (3) (a), (b) and (c), 7.08 (2) and 7.11 (1) (d) and (e); and to create RL 7.03 (1) and 7.07 (3) (e) and (4), relating to the impaired professionals procedure. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    After review by the department's Small Business Review Advisory Committee, it was determined that these proposed rules will have no significant economic impact on a substantial number of small businesses, as defined in s. 227.114 (1) , Stats.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Transportation
    The Wisconsin Department of Transportation adopts an order to create Trans 75, relating to bikeways and sidewalks in highway projects. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    This proposed rule has no effect on small business.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Transportation
    The Wisconsin Department of Transportation adopts an order amending section Trans 131.01 (2) , 131.02 (1m) , (6) , (10) , (34m) , (50m) , (54) and (56m) , 131.03 (title), (4) , (6) (title) , (a)1. , 2. and 4. , (d) 2. , 3. , 5. and 8. , (10) (a) 3. , (d) 2. , (11) (title) , (n) and (o) , (15) (a)1. , 2. , 12. , 23. , 24. and 29. , 131.04 (2) (b) and (c) , 131.05 (1) , (1) (j) and (3) , 131.06 (2) (b) , 131.07 (1) (b) , 131.11 (1) (intro.) , (a) and (e) , 131.12 (3) , 131.13 (1) (a) 4. and 6. , and (6) (b) and (c) , 131.14 (3) (title) , (5) (a) , (b) and (e) , and 131.15 (1) , relating to the vehicle emission inspection process. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    The rule will have no effect on small business.
    Summary of Comments by Legislative Review Committees
    No comments were reported.
    Workforce Development
    Public Works Construction Contracts,
    Chs. DWD 290 — 294
    Revises Chapter DWD 290 , relating to prevailing wage rates. Effective 1-1-11.
    Summary of Final Regulatory Flexibility Analysis
    Because the proposed rule carries forward the new or amended requirements of the statutes as affected by 2009 Act 28 , the proposed rule of itself does not have an effect on small business.
    Summary of Comments by Legislative Review Committees
    No comments were reported.